SWEETWATER STORM DRAIN
Project
Description
This project will relieve flooding along 83rd Avenue from
Sweetwater to the intersection of 83rd Avenue and Cactus Road.
The City will construct a 48-inch storm drain pipe, laterals,
and catch basins on Sweetwater Avenue between 87th and 85th
avenues; and a 36-inch storm drain pipe, laterals, and catch
basins on 83rd Avenue between Cactus Road and Windrose Drive.
Project at a Glance
|
Lead Agency |
City of Peoria
Dan Nissen (Peoria Project Manager)
Phone: 623-773-7212
E-mail:
Dan.Nissen@PeoriaAz.Gov |
|
Design Consultant |
Wood Patel |
|
Contractor |
N/A |
|
Project Budget |
$3,701,544 |
|
Funding Sources |
|
Project
Status
The construction contract is expected to be
awarded at the November 14, 2006 Council meeting.
Construction is expected to take four months.
|
Design |
100% |
|
|
Land
Acquisition |
100% |
|
|
Construction |
0% |
|