City of Peoria AZ Engineering Department

Engineering Home

City Hall Engineering Home
Return to the Engineering Home page.
Cell phone and directory Contact Us
Find contact info for our offices.
Pie Chart Capital Improvement
The CIP Division implements the CIP for streets, drains and more.
Plans and drawings Development
Development is responsible for plats, plans, drawings & more.
Files Download Forms
Download important forms and documents.
Traffic light Traffic Engineering
Traffic standards, NTMP, posts road closure information and more.
Bull dozer Building Peoria
Learn about current engineering projects going on in Peoria.
link of chain Important Links
Other related and important links.
Storm Water
Learn all about Peoria's storm drain system.

 Building Peoria logo

SWEETWATER STORM DRAIN

Project Description
This project will relieve flooding along 83rd Avenue from Sweetwater to the intersection of 83rd Avenue and Cactus Road. The City will construct a 48-inch storm drain pipe, laterals, and catch basins on Sweetwater Avenue between 87th and 85th avenues; and a 36-inch storm drain pipe, laterals, and catch basins on 83rd Avenue between Cactus Road and Windrose Drive.

Project at a Glance

Lead Agency City of Peoria
Dan Nissen (Peoria Project Manager)
Phone: 623-773-7212
E-mail:
Dan.Nissen@PeoriaAz.Gov
Design Consultant Wood Patel
Contractor N/A
Project Budget $3,701,544
Funding Sources
  • General Obligation Bonds

Project Status
The construction contract is expected to be awarded at the November 14, 2006 Council meeting.  Construction is expected to take four months.

Design 100%
25% 50% 75% 100%

 

                                     
Land Acquisition 100%
25% 50% 75% 100%

 

                                     
Construction 0%
25% 50% 75% 100%

 

                                     