City of Peoria AZ Engineering Department

Engineering Home

City Hall Engineering Home
Return to the Engineering Home page.
Cell phone and directory Contact Us
Find contact info for our offices.
Pie Chart Capital Improvement
The CIP Division implements the CIP for streets, drains and more.
Plans and drawings Development
Development is responsible for plats, plans, drawings & more.
Files Download Forms
Download important forms and documents.
Traffic light Traffic Engineering
Traffic standards, NTMP, posts road closure information and more.
Bull dozer Building Peoria
Learn about current engineering projects going on in Peoria.
link of chain Important Links
Other related and important links.
Storm Water
Learn all about Peoria's storm drain system.

 Building Peoria logo

67TH AVENUE INTERIM WIDENING

Project Description
67th Avenue, between Pinnacle Peak Road and Happy Valley Road, is a two-lane roadway with various segments improved by adjacent development to four lanes. Traffic volumes on this segment exceed the allowed capacity of a two-lane roadway. This project provides for the construction of temporary pavement to widen this segment of 67th Avenue to five lanes (one additional lane in each direction and a center turn lane). These improvements will provide immediate relief from traffic congestion until the permanent improvements are constructed in the future.

Project at a Glance

Lead Agency City of Peoria
Richard Costa (Peoria Project Manager)
Phone: 623-773-7951
E-mail:
Richard.Costa@PeoriaAz.Gov
Partner Agency

Maricopa County Department of Transportation (MCDOT)
Samir Hatab (MCDOT Project Manager)

Phone: 602-506-2867

Design Consultant Maricopa County Department of Transportation (MCDOT)
Contractor Centennial Contractors, Inc.
24-Hour Construction Hotline: 602-264-6416
Project Budget $970,000
Funding Sources
  • Maricopa County

  • General Obligation Bonds

  • City Transportation Sales Tax

Project Status
Construction began on October 11, 2006 on the east side of 67th Avenue.  The west side of 67th Avenue will follow the east side beginning in late October.  Construction will be completed by December 2006.  Traffic restrictions will be in place throughout construction, so motorists should allow extra time for travel in this area.

Design 100%
25% 50% 75% 100%

 

                                     
Land Acquisition 100%
25% 50% 75% 100%

 

                                     
Construction 15%
25% 50% 75% 100%

 

                                     