Inspection and Plan Review Fees for Installation,
Removal or Alteration of Equipment
| Permits (Section 105. |
Permit Fee |
| Asbestos
removal |
$50.00 per job |
| Compressed
gases *; install a system |
$250.00 per system
$150.00 per modifications |
|
Cryogens *; install a system |
$250.00 per system
$150.00 per modifications |
Flammable or combustible liquids *;
Tank Vehicle Dispensing Operations |
$360.00
per site |
Flammable or combustible liquids *;
Install, construct, alter Or abandon an underground or
Above ground tank (single or 1st) |
$360.00
per tank or task |
Flammable or
combustible liquids *;
Removal (single or 1st) |
$360.00 per tank
$50.00 per each additional tank |
| Hazardous materials *; install,
repair, abandon, remove, place out-of-service, tanks or piping, close or modify a storage
facility (single or 1st) |
$360.00 per tank or
task
$50.00 each additional
$100.00 per modification |
| Liquefied petroleum
gases *; install > 125 gal |
$360.00 per tank
$200.00 w/fixed Fire Protection |
| Ovens, industrial
baking or drying |
$50.00 per oven/
furnace or kiln |
| Refrigeration
equipment *; installation |
$50.00 per system |
| Spraying or dipping *
|
$150.00 per booth
(single or 1st) |