Building Peoria Home   I   Major Projects List   I  Road Closures

City Construction FAQ   I   Construction Lingo   I   Links

 
ROSE GARDEN
BASIN EXCAVATION (PW00184)

Project Description
The Rose Garden Lane Drainage Channel was completed in 2007-2008.  The storm water is collected and directed to the Agua Fria River, where a storm water basin is to be excavated.  This project is the final phase of the project to construct the Rose Garden Basin in the Agua Fria River.

 

Project at a Glance

Lead Agency

The Flood Control District of Maricopa County (FCDMC)               Mark Lewis (Project Manager)                                             Phone: 602-506-1501

Partner Agency

City of Peoria                                                                      Burton Charron (Project Manager)                                      Phone: 623-773-7212                                                                 E-Mail: burton.charron@peoriaaz.gov

Design Consultant Wood Patel and Associates
Bidder Otto Trucking
Project Budget $200,000.00
Funding Sources
  • Flood Control District of Maricopa County (50%)

  • General Obligation Bonds (50%)

Project Status
The project is complete.

Construction 100%
25% 50% 75% 100%

 

                                     

Links:

Plans

Updated December 15, 2011