Construction has started on
the basins preparing them for new irrigation and turf grass.
Portions of the east basin are being enlarged so that park amenities can
be placed in or on the edge of the west basin. Negotiations with
Hunter Contracting continue for a contract to construct the entire park
site.
click to view preferred master plan
back
Background:
Council,
on its May 1st 2007 meeting, approved a contract with Environmental
Planning Group (EPG) to develop a master plan and a design concept
report for the West Wing Neighborhood Park.
The
land is located on West Wing Parkway between High Desert Dr and Black Rock
Blvd.
|