Project Description
This project will expand an existing reservoir and booster pump station that provides the primary water source for Vistancia.  Water is stored at the site and pumped to Zones 4 and 5 of the City of Peoria potable water distribution system.  The main components of the project include:

  • 2.5 million gallon steel reservoir

  • One pump to be added to each of Zones 4 and 5 booster stations

  • Electrical improvements, including a new generator

  • Improvements to the chlorine system

  • On-site piping

  • Pressure reducing valve connecting Zone 5 to Zone 4

This project also includes upgrading the programming of the system's supervisory control and data acquisition (SCADA) system to current City standards.

Project at a Glance

Lead Agency City of Peoria
Joe Kurrus (Peoria Project Manager)
Phone: 623-773-7753
E-mail:
Joe.Kurrus@peoriaaz.gov
Design Consultant Wilson Engineers
Contractor MGC Contractors, inc.
Project Budget
(Construction)
$2,315,433
Funding Source VCFD

Project Status:
Reservoir construction completed; site piping and electrical underway, and pump installation started.

Design 100%
25% 50% 75% 100%
                                       
Construction 50%
25% 50% 75% 100%

 

                                     

Updated July 28, 2010