 Deer Valley Road Widening and Drainage Improvements

91st Avenue to 83rd Avenue

Project Description
The City of Peoria (City) in cooperation with the Maricopa Department of Transportation (MCDOT) are working to complete the drainage and roadway improvements along Deer Valley Road between 91st Avenue and 83rd Avenue.  The City will be constructing drainage culverts under Deer Valley Road to convey storm runoff that historically ponded along the north side of Deer Valley Road to the existing channel along the south side of Deer Valley Road.  The roadway improvements consist of pavement, curb, gutter, sidewalk, streetlights and landscaping.  Upon completion of the roadway improvements, Deer Valley Road will accommodate 2 lanes in each direction, a center two-way left turn lane and bike lanes.

Project at a Glance

Lead Agency

 

City of Peoria
Karl Zook (Project Manager)
Phone: 623-773-7260
E-mail:
Richard.costa@PeoriaAz.Gov
Design Consultant Premier Engineering
Contractor Achen-Gardner Engineering, LLC
Project Budget $3,633,637
Funding Sources

General Obligation Bonds

Proposed General Obligation Bonds

Project Status
The project design is 100% complete.  Construction of the drainage and roadway improvements are to be completed in Fall 2009.

Design 100%
25% 50% 75% 100%

 

                                     
Land Acquisition 100%
25% 50% 75% 100%

 

                                     
Construction 50%
25% 50% 75% 100%

 

                                     