DEER VALLEY ROAD REPAIR, 83rd AVENUE TO HILLCREST
BOULEVARD (PW01005)
Project
Description
A portion of Deer Valley Road pavement is failing under the
heavy traffic that has been added to the road since it was
constructed. The north lane and parts of the adjacent lane,
which were constructed when the area was in the County, are failing
along the section of the road from Hillcrest Boulevard west to 83rd
Avenue. This project calls for the removal of the thin section
of pavement and a complete rebuilding of that area. The new
section will conform to the City of Peoria standards for arterial
roadways.
Project at a Glance
|
Lead Agency |
City of Peoria
Geoffrey Zinnecker (Peoria Project Manager)
Phone: 623-773-7293
E-mail:
Geoffrey.zinnecker@Peoriaaz.gov |
|
Design Consultant |
In-House |
|
Contractor |
J. Banicki
Construction, Inc. |
|
Project Budget |
$500,160.00
|
|
Funding Sources |
GO Bonds
Proposed General
Obligation Bonds |
Project Status Schedule
The project design is 100% complete. Construction
of the roadway repair is to be completed by March 2010.
|
Design |
100% |
|
|
Construction |
100% |
|
Links
Updated: March 24,
2010
|